Flood damage in the Tama Murato area (Kuma Murayu Station) One year and three months have passed since the disaster occurred

Disaster Type the July 2020 heavy rains
Contributor H3 Co., Ltd.
Creation Date 2021-09-27
Creation Place Totoo, Kuma Village, Kuma District, Kumamoto Prefecture
Possibility of Secondary Usage Secondary use is allowed.