Flood damage in the Tama Murato area (Kuma Murayu Station) One year and three months have passed since the disaster occurred
Disaster Type | the July 2020 heavy rains |
---|---|
Contributor | H3 Co., Ltd. |
Creation Date | 2021-09-27 |
Creation Place | Totoo, Kuma Village, Kuma District, Kumamoto Prefecture |
Possibility of Secondary Usage | Secondary use is allowed. |